
Solutions
Process Control
Control commissioned from your own plant data — retrofitted into whatever runs your loops today, or specified before startup from the process design.
Book a timeThe industry problem
Control algorithms are settled engineering. What decides whether a loop holds is the model underneath them — and a test that was too short produces a model that fits its own data almost perfectly while describing the wrong process entirely.
What Lavoisier Labs does here
Loop models built from the plant’s own operating data
An explicit verdict on whether that data was ever enough to support a model
Classical and model predictive control from the same identification
Commissioned into the control system already running the loop
Example workflow
Learn how the loop behaves — from a supervised test where it will take one, from setpoint moves under the controller already running where it will not, or from the process design before a plant exists. Build the model, accept or refuse it on the evidence, then commission the controller the loop actually needs.
Relevant regulations
Nothing of ours executes inside the loop: settings are commissioned on the block already in service, so there is no new hardware to certify and your controller keeps running regardless.
